Âé¶¹´«Ã½

News

New charging station can charge up to four electric vehicles simultaneously

Finland's first manufacturer-independent fast charging station for electric vehicles is in use at the 2020 Housing Fair area in Tuusula.
latauasema

Aalto-born technology company Unified Chargers has created a new type of electric vehicle charging station that can charge any brand of electric vehicle. An easy-to-use and open mobile application is used to control the charging process and for payment.

'The feedback we have received from customers has been mostly positive, since there is no queuing with this new station,' says Jukka Anttonen, CEO of Unified Chargers.

'It is often thought that we need faster charging stations, but in fact the vehicle is usually the bottleneck. If one vehicle is connected to a fast charging station, it receives all of the station's capacity. Most vehicles can handle such high charging power for only a moment, after which they drop to 30–40 kilowatt power,' he adds. 'We have the possibility of building fast charging stations for up to 20 vehicles.'

The station offers a total of 60 kW of charging power, which is intelligently split among connected vehicles. The application optimises charging time with consideration for the varying charging rates among vehicles. When one vehicle is fully charged, the available charging power is then automatically reassigned to other users. This means that the station's efficiency remains the same regardless of how many vehicles are connected. The station supports both the CCS and CHAdeMO fast charging standards.

Unified Chargers has a positive view of the future, as the company has already received patents for its technology in China, India and USA.

Fast charging stations are especially in demand in densely-populated areas, on roads out of the city and in business clusters.

'For many electric vehicles, a drive from Helsinki to a meeting in Tampere is enough to drain the battery. Fast charging during a meeting is convenient and makes trips like these go smoother,' Anttonen says.

The fast charging station is a a part of Neste's low-emissions service station of the future. The charging station was built in collaboration with Leppäkosken Energia.

  • Updated:
  • Published:
Share
URL copied!

Read more news

IB-opiskelijoita Mikkelin kampuksella
Studies Published:

From Mikkeli to Otaniemi and on to the world

The School of Business Bachelor’s Programme in International Business will move to Otaniemi in August 2026
Aalto Inernational Talent -ohjelman opiskelijoita vierailemassa Outokummun toimitiloissa Helsingissä.
Cooperation Published:

Aalto International Talent Program mentor Matti Aksela: I recommend participating to all companies

The Program enables companies to get to know international talent easily and develop a more diverse work community.
Person at shared desk browsing a student course catalogue on a laptop, with plants and office supplies nearby
Cooperation, University Published:

Doctoral positions at Unite! universities now available in one place

Unite! students searching for doctoral positions can now explore a dedicated category in the Unite! Catalogue for Students.
Helenin voimalaitos Vuosaaressa
Studies Published:

Students developed a service blueprint for remote plant advisory services

A multidisciplinary team of master’s degree students from Aalto University collaborated with Sumitomo SHI FW (SFW) in a customized project